Get free alertsFree alerts

DfI Rivers Directorate Framework for Watercourse Maintenance

Open: 18 days left to bid.

Is it one for you? Score it for your firm in 10 seconds
At a glance
Type of workConstruction and civil engineering
WhereNorthern Ireland
Value£13.1mExcluding VAT, as publishedFor a framework this is usually the most all suppliers together could be paid, not one firm's share
Contract length4 years
What you winFramework for one or more suppliers: winning puts you on a list, and work comes later through call-offs, so it is not guaranteed
LotsSplit into 5 lots, listed belowThe tender documents say how many you can bid for
How to bidOpen: a single stage, where suppliers send a full bid by the deadline
Suitable for SMEsYes, says the buyer
Deadline10 Dec 2026, 15:00 UK time
Published11 Nov 2026
BuyerDfI Transport and Road Asset Management (TRAM)
SourceFind a Tender

Read the official notice

Deadline in your calendar:GoogleOutlook or Apple

What you'll need to bid

Before you start

  • Follow Read the official notice to see where to register, download the documents and send your bid.
  • Have your supplier details on the Central Digital Platform: most tenders under the Procurement Act 2023 ask for them. How to register

What the buyer asks for

  • Nothing specific is stated on the notice itself. Most buyers ask for proof of insurance, a health and safety policy and recent accounts, and the tender documents say exactly what this one needs.

Picked out automatically from the notice text. The tender documents are the final word.

What the buyer says

The Department for Infrastructure Rivers Directorate is establishing a Watercourse Maintenance Framework for the delivery of watercourse maintenance and flood defence related works across Northern Ireland. The Framework is intended to support the management of flood risk, maintenance of designated watercourses and associated drainage infrastructure, and the preservation of hydraulic capacity within the river network. The Framework will operate for a period of four years and will be divided into five geographical Lots; comprising of: Lot 1 (WME1) Lisburn and Greater Belfast; Lot 2 (WMW1) Coleraine; Lot 3 (WMW2) Omagh; Lot 4 (WME2) Armagh, and; Lot 5 (WMW3) Fermanagh. For each Lot, the Authority intends to appoint a Primary Supplier and a Reserve Supplier. Call off contracts will be awarded as Measured Term Contracts (MTCs), with individual Works Orders ranging in value up to £250,000 (excluding VAT). The Framework is structured to promote continuity of service delivery, maintain competition and support supply chain resilience. The scope of works may include, but is not limited to the following principal work activities: A) Maintenance of designated watercourses, B) Riverbank and flood defence maintenance and scrub clearance, C) Tree felling/removal, D) Provision of labour/plant' and E) Treatment of aquatic weed/invasive species.

Lots (5)

The tender documents say how many you can bid for.

  1. WME1 (Lisburn and Greater Belfast)
  2. WMW1 (Coleraine)
  3. WMW2 (Omagh)
  4. WME2 (Armagh)
  5. WMW3 (Fermanagh)
Fit check: is it one for you?

Pick your area to score this construction and civil engineering contract for your firm, using our area, size, deadline and SME rules.

Want contracts like this by email?

We score new construction and civil engineering contracts against what you do, your area and your size, and email the best matches when there are new ones. Free every weekday for your first two weeks, then on Mondays, or every weekday for £19 a month.

Get free alerts

Bidding for this one?

We write the answers from your own evidence, from £295 a tender, with a fixed price agreed before you pay.

See bid writing

More open contracts from DfI Transport and Road Asset Management (TRAM)

DfI Transport and Road Asset Management (TRAM): past construction and civil engineering awards

2 contracts awarded in our data, typical value £15.6m.

Similar open contracts