Get free alertsFree alerts

ORiW: Design and Integration Partner

Open: 8 days left to bid.

Is it one for you? Score it for your firm in 10 seconds
At a glance
Type of workArchitecture, engineering and surveying
WhereCheshire, North West
Value£600mExcluding VAT, as publishedFor a framework this is usually the most that could be paid over its life, not a guaranteed amount
Contract length4 yearsCan be extended to 14 Apr 2040
What you winFramework with a single supplier: the winner is appointed, and work comes through call-offs as it is needed, so the amount is not guaranteed
How to bidCompetitive flexible: the buyer sets its own stages, which can include a shortlist. The tender documents explain them
How bids are scoredQuality 60%, Price 40% (quality often includes social value)
Suitable for SMEsNot stated
Deadline30 Nov 2026, 14:00 UK time
Published5 Nov 2026
Last changed6 Nov 2026The buyer has edited the notice since it went out
BuyerUnited Utilities Water Limited
SourceFind a Tender

Read the official notice

Deadline in your calendar:GoogleOutlook or Apple

What you'll need to bid

Before you start

  • Follow Read the official notice to see where to register, download the documents and send your bid.
  • Have your supplier details on the Central Digital Platform: most tenders under the Procurement Act 2023 ask for them. How to register

What the buyer asks for

  • Nothing specific is stated on the notice itself. Most buyers ask for proof of insurance, a health and safety policy and recent accounts, and the tender documents say exactly what this one needs.

How bids are judged

  • Bids are scored on: Quality 60%, Price 40% (quality often includes social value).

Picked out automatically from the notice text. The tender documents are the final word.

What the buyer says

This notice relates to tender activity for the provision of certain design and integration services, as explained below. United Utilities Water Limited (UU) proposes to deliver a programme titled Only Rainwater into Windermere (ORiW), with the ambition to make Windermere the cleanest lake in England by removing discharges from both public and private sources, while also addressing highway runoff. This is a long-term, transformational programme designed to protect the lake's ecology, water quality and amenity value for future generations. The target end state is "Only Rainwater into Windermere", restoring the lake as close as possible to its natural condition and reducing the risk of harmful algal blooms and chemicals. The programme will deliver resilient wastewater infrastructure that supports communities, businesses and the wider National Park, while creating a potential blueprint for freshwater restoration across England. This Scope of Requirements does not include agricultural impacts; these are being considered by other programmes. A coalition has been established to develop and deliver the ORiW feasibility phase. It brings together key stakeholders, including UU, local authorities, regulators and environmental organisations, to provide strategic direction and has sponsored the commission of a ‘feasibility study’ to ascertain the art of the possible for achieving ORiW. Through the commission there are now feasible options for achieving the ambition, to improve water quality, and enhance the environmental resilience of the Windermere catchment, through a proposed ORiW system and wider infrastructure. The proposed ORiW system is made up of multiple workstreams; • First Time Sewerage (FTS), connecting properties to the public sewer network that are currently outside of the network and have never previously been connected to it. • First time Treatment (FTT), for the sites where FTS is not possible, a remote treatment solution will be implemented. • Reduced weather dependent flow, surface water management and management and treatment of highways runoff through the use of nature- based solutions where possible across the catchment. • Construction of tunnel, sewers, rising mains and associated infrastructure. • Upgrade of an existing wastewater treatment works and discharge point. UU anticipates that the ORiW system and the other strategic wastewater transfer and treatment infrastructure required for the ORiW programme (including the tunnel, rising mains, pumping stations, wastewater treatment facilities, associated drainage works and all ancillary infrastructure), will be promoted through a Development Consent Order (DCO) as a Nationally Significant Infrastructure Project (NSIP), subject to Section 35 approval by Defra. [SM1.1][WD1.2] UU are launching a competitive tendering procedure for the appointment of a Design and Integration Partner (D&IP) who will be responsible for supporting the next phase of this programme, designing the ORiW system, including whole system integration, to achieve the programme vision. UU requires the D&IP to complete feasibility, outline design, constructability and other related activities to obtain the necessary approvals and consents for the programme to proceed to the delivery phase for the preferred solution. Accordingly, the D&IP will also be responsible for the delivery of the DCO and planning approvals. As such, the outline design needs to fully support and integrate with the DCO, Town and Country Planning Act (TCPA) and land acquisition and access processes. At a high level, the initial scope of requirements for the D&IP will include, but may not be limited to the following activities across each of the workstreams of the ORiW system; • Outline Design • Planning, Consents and Land • Environmental Impact Assessments (EIA) and surveys • Stakeholder and Customer Engagement • Land Agency, Referencing and Surveying • Preparation and submission of planning applications and all supporting information • Preparation and submission of the DCO and all supporting information • Site Investigation (SI) • Early Contractor involvement (ECI) • Supporting UU in meeting reporting requirements with Ofwat i.e. PR29 Price Review • Supporting UU with any required preparation, development and submission of information for the Water Industry National Environment Programme (WINEP) and Drainage and Wastewater Management Plan (DWMP) UU require a D&IP who has the capability and experience to ensure coordination over integration of all elements of the ORiW system and all other related activities that are required. The D&IP will also need to be capable of leading the overall delivery strategy, managing interfaces across the programme, maintaining design consistency, and ensuring that the complete solution meets the requirements to obtain the necessary approvals and consents. UU is continuing to consider its approach to the delivery phase of the programme and anticipates that it may need ongoing support from the D&IP into the delivery phase to provide continuity throughout the programme lifecycle.

[The rest is on the official notice.]

Fit check: is it one for you?

Pick your area to score this architecture, engineering and surveying contract for your firm, using our area, size, deadline and SME rules.

Want contracts like this by email?

We score new architecture, engineering and surveying contracts against what you do, your area and your size, and email the best matches when there are new ones. Free every weekday for your first two weeks, then on Mondays, or every weekday for £19 a month.

Get free alerts

Bidding for this one?

We write the answers from your own evidence, from £295 a tender, with a fixed price agreed before you pay.

See bid writing

More open contracts from United Utilities Water Limited

Similar open contracts