Closes in 3 days.
| Type of work | Electrical, heating and plumbingOfficial category: Electrical machinery, apparatus, equipment and consumables; lighting |
|---|---|
| Where | West Midlands |
| Value | £1m to £2.5mExcluding VAT, as published |
| Contract length | About 7 months |
| Suitable for SMEs | Not marked |
| Deadline | 25 Nov 2026, 17:00 UK time |
| Published | 19 Nov 2026 |
| Buyer | VVB Engineering (UK) Ltd |
| Source | Contracts Finder |
What you'll need to bid
Before you start
- Follow Read the official notice to see where to register, download the documents and send your bid.
What the buyer asks for
- Nothing specific is stated on the notice itself. Most buyers ask for proof of insurance, a health and safety policy and recent accounts, and the tender documents say exactly what this one needs.
Picked out automatically from the notice text. The tender documents are the final word.
What the buyer says
The scope of works includes a two-stage delivery approach covering the complete design, supply, configuration, integration, testing and installation of the Building Management System for Canley Brook, Burton Green and Stoneleigh Pumping Stations under the HS2 N1/N2 MEICA works. The centralised system at each location shall comprise of a dedicated BMS panel with dual-redundant PLCs, HMIs, remote interface enclosures and a dedicated BMS LAN, and distributed interface enclosures located within the relevant plant rooms to facilitate communications between plant systems and provide connectivity to the HS2 Network Integrated Control Centre (NICC). The BMS shall integrate the mechanical and electrical building services, providing monitoring, control, alarm management, and operator interfaces for the pumping stations and portal building. The system shall be designed in accordance with the project control strategy and applicable HS2 technical standards while coordinating with interfacing subcontractors to ensure seamless integration of all connected systems. The proposed BMS shall provide monitoring, control, alarms and graphical visualisation for HVAC, LV distribution and metering, UPS, lighting, fire alarms, public health services, pumped drainage and disabled toilet alarms. The scope also includes reviewing design inputs, updating the Functional Design Specification and generic drawings, and coordinating all interfaces required for full mechanical and electrical system integration. Sella Controls will also assess the cyber security risks associated with the BMS system. Additional information: Please review the Scope of work and drawings for the works.
Pick your area to score this electrical, heating and plumbing contract for your firm, using our area, size, deadline and SME rules.
Want contracts like this by email?
We score new electrical, heating and plumbing contracts against what you do, your area and your size, and email the best matches when there are new ones. Free every weekday for your first two weeks, then on Mondays, or every weekday for £19 a month.
Get free alerts